集团

资讯详情

The work of Jinming Yu Technology company has a good start

  • Categories:Group News
  • Author:
  • Origin:
  • Time of issue:2022-01-29 17:36
  • Views:

(Summary description)At the end of the New Year, Jinmingyu Technology Co., Ltd. has planned in advance and vigorously promoted the implementation of various work to lay a solid

The work of Jinming Yu Technology company has a good start

(Summary description)At the end of the New Year, Jinmingyu Technology Co., Ltd. has planned in advance and vigorously promoted the implementation of various work to lay a solid

  • Categories:Group News
  • Author:
  • Origin:
  • Time of issue:2022-01-29 17:36
  • Views:
Information

At the end of the New Year, Jinmingyu Technology Co., Ltd. has planned in advance and vigorously promoted the implementation of various work to lay a solid foundation for high-quality development after the Spring Festival.

First, according to the tasks and objectives of PC Workshop in 2022, we should do a good job in the division of responsibilities and make sure that all the finishing work of the workshop is successfully completed.

The second is to use the morning meeting to summarize and comment on the daily work to ensure that the daily work is put into practice. Do the equipment maintenance work of the assembly line and mixing station, arrange the production line staff to do the mold table and mold grinding, spray the release agent for maintenance, and correct the mold. Arrange special personnel to polish the seriously corroded die table and brush antirust paint to improve the service life of the die. At the same time, arrange machinery maintenance personnel to do a good job in the maintenance and overhaul of all kinds of equipment, focus on the elimination of "running, braving, dripping, leakage" phenomenon and illegal operation problems, and timely rectify the steam valve damage and leakage in the workshop, and the dripping and leakage phenomenon of admixture pipeline connection.

Third, for the use of prefabricated laminated boards and stair boards in Building 5 and 8 of Mingdu Garden in the New Year, I went to the project department in advance to do a good job of drawing docking, and prepared the molds required for production in advance to do a good job of steel sample turning of laminated boards and stair steel cage binding; At the same time, prepare for the second deepening of the project drawings of Tongfang Science and Technology Incubation Park and the opening of molds.

Jinmingyu Technology Co., Ltd. made plans, decomposed tasks, considered the work of the whole year and implemented it accurately, laying a foundation for the company to complete tasks and presenting a gift for the 20th anniversary of the group with excellent results.

News

weiye

Contact Us

 

Tel:0539-6263777

E-mail:sdwyjt@126.com

Address: West End of Zhengda Street, Linshu County, Linyi City, Shandong Province

weiye

Mobile site

weiye

Weiye Public Account

Page Copyright © Weiye group      鲁ICP备16000130号-2   Powered by  www.300.cn